Granny flat rules and requirements in NSW
In NSW you can build a granny flat (a "secondary dwelling") on most residential lots. If it meets every state standard you can get fast complying development approval (a CDC) from a council or private certifier: the lot must be at least 450 m² and 12 m wide, and the granny flat no bigger than 60 m². If it doesn't meet them, you can lodge a development application with your council instead.
General information from the state rules, not legal or planning advice. Councils can add their own conditions, and land with bushfire, flood or other constraints may not be able to use the fast CDC route. Confirm with a certifier or your council before you build.
The rules at a glance
| How you get approval | Complying development certificate (CDC) from a council or private certifier, or a development application (DA) to council |
|---|---|
| Maximum size | 60 m² (a council plan can allow more under a DA) |
| Minimum lot size for a CDC | 450 m² |
| Minimum lot width for a CDC | 12 m for 450-900 m²; 15 m for over 900-1,500 m²; 18 m for over 1,500 m² |
| Maximum height | 8.5 m |
| Side setback | 0.9 m (450-900 m² lot), 1.5 m (900-1,500 m²), 2.5 m (over 1,500 m²), plus 25% of any height above 3.8 m |
| Rear setback | 3 m (450-900 m² lot), 5 m (900-1,500 m²), 10 m (over 1,500 m²), plus 3 x any height above 3.8 m up to a cap |
| How many | One house and one granny flat per lot; the lot can't be subdivided |
| Parking | No extra parking needed |
| Renting it out | Not restricted by the state rules |
Do I need council approval for a granny flat in NSW?
Yes. In NSW it needs a complying development certificate (CDC) from a council or private certifier if it meets every state standard, or a development application (DA) to council if it doesn't, then an occupation certificate before anyone moves in.
CDC or DA: which approval?
A granny flat (secondary dwelling) can be approved as complying development by a council or accredited certifier if it meets every standard in the Housing SEPP 2021. If it doesn't, you can lodge a DA with your council instead. The main house and granny flat can be approved together in one complying development certificate. Complying development needs a lot of at least 450 m² (unless the granny flat sits entirely inside the existing house). Granny flats are allowed in residential zones R1 to R5; councils can allow them in other zones through their own plan (LEP). For a DA, each council's LEP can allow more floor area than 60 m² (often a percentage of the main house).
Approvals you'll need
- Complying development certificate (council or accredited certifier), or
- Development consent (DA) from council, then a construction certificate
- Occupation certificate before anyone moves in
Can I build a granny flat on my block?
For the fast CDC route, check each of these against the Housing SEPP (Schedule 1):
- Your lot is in a residential zone (R1 to R4; R5 large lots need a DA) and is at least 450 m²
- It is at least 12 m for 450-900 m²; 15 m for over 900-1,500 m²; 18 m for over 1,500 m² at the building line
- All buildings together cover no more than 50% of a 450-900 m² lot, 40% of 900-1,500 m², 30% over 1,500 m²
- Front setback: The average of the 2 nearest houses on the same side of the street within 40 m; otherwise 4.5 m (450-900 m² lot), 6.5 m (900-1,500 m²), 10 m (over 1,500 m²)
- Landscaped area of at least 20% (450-600 m² lot), 25% (600-900 m²), 35% (900-1,500 m²), 45% (over 1,500 m²), at least half behind the front building line
- At least 24 m² of private open space, which can be shared with the main house
- If the land is bushfire prone or a flood control lot, extra standards apply (Housing SEPP s 57-58) and some sites can't use a CDC
Miss one and you can usually still apply through a DA, where your council's local plan decides.
Key conditions
- One main house and one granny flat per lot
- The lot can't be subdivided to separate the granny flat
- Complying development: lot of at least 450 m² and at least 12 m wide at the building line (wider for bigger lots), except a granny flat built entirely inside an existing house
- Maximum 60 m² floor area (council pages citing the Housing SEPP); a council LEP can allow more under a DA
- Allowed in zones R1, R2, R3, R4 and R5; other zones only if the council LEP allows it. Complying development (CDC) is limited to residential zones other than R5 Large Lot Residential, so an R5 granny flat goes by DA (Housing SEPP s 54(1)(a))
- No extra car parking required by the Housing SEPP
- Rural zones: some councils have adopted LEP clause 5.5, which sets the size limit and maximum distance from the main house
- Bushfire-prone land: no CDC on land at BAL-40 or the flame zone (BAL-FZ); below that a CDC is possible only if the Housing SEPP's bushfire conditions are met (Planning for Bush Fire Protection, building within 200 m of a road, among others). Land counts as not BAL-40/FZ if the council or a recognised consultant certifies it (Housing SEPP s 57)
- Flood control lots: no CDC on the flood storage, floodway, flow path, high hazard or high risk parts (certified by council or a hydraulic engineer); elsewhere the granny flat must meet flood standards, which an engineer's flood and risk impact report can show (Housing SEPP s 58)
- Heritage: no CDC on a heritage item or draft heritage item, and the CDC route excludes land listed in Codes SEPP clause 1.19(1), which the Department's guide says covers heritage conservation areas (Housing SEPP s 54(2)(b) and (3)(c); Guide to Complying Development, Aug 2023)
Can I rent out my granny flat?
The Housing SEPP's secondary dwelling sections (as made, ss 49-56) set no rule on who may live in a granny flat, so the state rules don't stop you renting it out. Check the conditions on your own approval, and residential tenancy law applies once you have a tenant.
Tiny homes are different
A tiny home on wheels is treated as a caravan, not a granny flat, so placing it and living in it follow different rules. Tiny home rules in NSW.
Granny flat rules by council
What each council adds for a DA (size, lot, contributions, bushfire and flood land), for the areas we cover so far:
- Blacktown
- Campbelltown
- Canterbury-Bankstown
- Central Coast
- Newcastle
- Parramatta
- Cumberland
- Hornsby
- Lake Macquarie
- Liverpool City Council
- Northern Beaches
- Penrith
- Sutherland Shire
- The Hills Shire
- Wollongong
Sources: Secondary dwellings - NSW Department of Planning (updated 17 July 2025); Secondary dwellings (granny flats) - disaster recovery - NSW Department of Planning (updated 7 March 2024); Guide to Complying Development (revised August 2023) - NSW Department of Planning; Granny Flats - Wollongong City Council (cites Housing SEPP: 450 m² lot, 60 m²); Secondary dwelling - Hornsby Shire Council (60 m² in residential zones); State Environmental Planning Policy (Housing) 2021, Schedule 1 (current version for 9 October 2026); State Environmental Planning Policy (Housing) 2021 as made, ss 49-58 (ss 54, 57, 58 read 21 Oct 2026: R5 out of CDC, bushfire, flood control lots); Guide to Complying Development (revised August 2023), pp 2-8 to 2-13 and 4:3-02: cl 1.19 excluded land incl. heritage conservation areas, BAL-40/BAL-FZ, flood (read 21 Oct 2026); Housing SEPP 2021, current version for 9 Oct 2026, ss 54, 57, 58 (read 21 Oct 2026); Codes SEPP 2008, current version for 11 Sep 2026, cl 1.19(1) and 'detached development' definition (read 21 Oct 2026). Checked 21 Oct 2026.
Questions people ask
Do I need council approval for a granny flat in NSW?
Yes. In NSW it needs a complying development certificate (CDC) from a council or private certifier if it meets every state standard, or a development application (DA) to council if it doesn't, then an occupation certificate before anyone moves in. NSW granny flat rules.
Can I build a granny flat without council approval?
Not without any approval, but often without a development application. If the granny flat meets every state standard, a private certifier can issue a complying development certificate (CDC) instead of council deciding a DA. A portable unit kept on a registrable trailer is treated as a caravan, which has its own rules: tiny home rules in NSW.
What size can a granny flat be in NSW?
Up to 60 m² under the state rules. Under a DA, your council's local plan can allow more. The house, granny flat and enclosed attached structures together are also capped by lot size: 330 m² on 450-600 m² lots, 380 m² on 600-900 m², 430 m² over 900 m².
What is the minimum block size for a granny flat in NSW?
450 m² for the fast complying development (CDC) route, and at least 12 m wide at the building line (12 m for 450-900 m²; 15 m for over 900-1,500 m²; 18 m for over 1,500 m²). Smaller lots may still be approved through a DA if the council's plan allows.
How close to the boundary can a granny flat be?
Under a CDC, side setbacks are 0.9 m (450-900 m² lot), 1.5 m (900-1,500 m²), 2.5 m (over 1,500 m²), plus 25% of any height above 3.8 m. Rear setbacks are 3 m (450-900 m² lot), 5 m (900-1,500 m²), 10 m (over 1,500 m²), plus 3 x any height above 3.8 m up to a cap.
Can I rent out my granny flat in NSW?
The Housing SEPP's secondary dwelling sections (as made, ss 49-56) set no rule on who may live in a granny flat, so the state rules don't stop you renting it out. Check the conditions on your own approval, and residential tenancy law applies once you have a tenant.
Can I subdivide and sell the granny flat separately?
No. The Housing SEPP says a lot with a granny flat can't be subdivided to separate it.